Home / Shop
13-04-11 - Budget and Cost Report by Job, Cost Code with Committed Cost
$595.00






- Description
13-04-11 - Budget and Cost Report by Job, Cost Code with Committed Cost
Report Description:
Groupings & Subtotals: Job, CC Division, Cost Code
Notes: Run this Report in the Cost-to-Complete module (6-8-1).
Update job in 6-8-1 before running this report.
Pop-Up Screen: None
Great report showing the Cost to Complete module (6-8-1) info: Job, CC Division, Cost Code, andCost Types (Mat, Lab, Sub, Oth, Usr6, Usr7, Usr8).
Amazing Summary Page at end of report.